Schweitzer-Mauduit International
Boilers and Pumps
Hill was instrumental in the planning and installation of two "package" boilers, along with two feedwater pumps, which replaced the inefficient aged boilers, one used for heating, and one used for the manufacturing process.
Facility demands had dramatically dropped due to a decrease in production. The new boilers are significantly more efficient to operate. Investment payback was realized within one year. Hill was responsible for all permitting, equipment layout, piping design, and construction following.