Hill prepared existing conditions site plans of the Byron Weston Mill Dam #1 and adjoining riverbed of the Housatonic River prior to repairs to the dam. This included plan and profile drawings. After repairs were completed, Hill prepared as-built plans showing many different angles of the dam to adequately detail the intricate repairs put in place.